EE 5G Install – Upgrade

Project Name:

Steeplejack


Project details:

We have recently been appointed to carryout Electrical Design of this EE 5G – NR34 build, greenfield located near Lancashire. Armed with the latest MBNL spec, we completed the design within a day. The specific requirements for the site has been accepted and tendered with the end client – RFT.

Project Start date – July 2022

Project Finish date – July 2022

Project Scope:
  • Full Electrical Design of services
  • Full suite of electrical reports
  • DC systems and calculations
  • AC reconfigure to match latest standards
  • Dual operators planned and spec’d for
  • Update of client with additional issues and possible variations