EE 5G Install – Upgrade
Project Name:
Steeplejack
Project details:
We have recently been appointed to carryout Electrical Design of this EE 5G – NR34 build, greenfield located near Lancashire. Armed with the latest MBNL spec, we completed the design within a day. The specific requirements for the site has been accepted and tendered with the end client – RFT.
Project Start date – July 2022
Project Finish date – July 2022
Project Scope:
- Full Electrical Design of services
- Full suite of electrical reports
- DC systems and calculations
- AC reconfigure to match latest standards
- Dual operators planned and spec’d for
- Update of client with additional issues and possible variations